Only a few pictures at the moment during these unusual times.
|
Entrance
|
|
New sign |
New beds and entrance at the clubhouse including new sign and re-branding of the club logo.
Pathway improvements had started, trying to link over wet areas from the winter. Once we are back, these areas will take 2nd place to grass so they may remain unfinished until later in the summer. We have topped up and levelled 4th, 6th and 9th Lower with extensions cut on 6, 7, 9, and 11th Lower.
|
4th Lower |
All greens were tined before minimum maintenance kicked in. They got 1.25 ton per green and a tight hole spacing down to 75mm. Surfaces are still bumpy but having know customers helps in this respect.
|
Sand/Holes |